• Home
  • Who We Are
    • History
    • Faculty/Staff
    • Contact Us
  • Services
    • Testing
    • Finite Element Analysis
    • Design/Consulting
  • Pooled Fund
    • About
    • Member States
    • Active Projects
    • Members Only
  • Tech Transfer
    • Newsletters and Featured Research
    • Research Hub
    • Pool Fund Consulting Questions
    • AFB20 (user/password required)
MWRSF

Search

Non-proprietary system test reports are available for download in PDF format at no charge. If a PDF for the report is not available, contact MwRSF at mwrsf@unl.edu.

Search by Abstract, Author, Title, Keyword, Report Number, Report Date, Sponsoring Agency, and Full Scale Test Number, for publications by entering search criteria in the field below.

Disclaimer: Reports are not sortable by Title or Sponsoring Agency.

View All Reports Listing Download Latest Report Listing

All published reports



Title Sponsoring Agency Full-Scale Test Number Report Number Report Date (Y/M/D)
Evaluation of the Minnesota Noise Wall and Rubrail System (NEW) Minnesota Department of Transportation MNNW-1
MNNW-2
MNNW-3
TRP-03-396-19 2019-01-31
Performance Evaluation of New Jersey’s Portable Concrete Barrier with a Traffic-Side Pinned Configuration and Grouted Toes – Test No. NJPCB-7 (NEW) New Jersey Department of Transportation NJPCB-7 TRP-03-374-18 2018-12-18
Performance Evaluation of New Jersey’s Portable Concrete Barrier with a Back-Side Pinned Configuration and Grouted Toes – Test No. NJPCB-6 (NEW) New Jersey Department of Transportation NJPCB-6 TRP-03-373-18 2018-12-14
Performance Evaluation of New Jersey’s Portable Concrete Barrier with a Box-Beam Stiffened Configuration and Grouted Toes – Test No. NJPCB-5 (NEW) New Jersey Department of Transportation NJPCB-5 TRP-03-372-18 2018-12-13
Performance Evaluation of New Jersey’s Portable Concrete Barrier with a Free-Standing Configuration and Grouted Toes – Test No. NJPCB-4 (NEW) New Jersey Department of Transportation NJPCB-4 TRP-03-371-18 2018-12-12
Performance Evaluation of New Jersey’s Portable Concrete Barrier with a Bolted Configuration and Grouted Toes – Test No. NJPCB-2 (NEW) New Jersey Department of Transportation NJPCB-2 TRP-03-340-18 2018-12-11
Performance Evaluation of New Jersey’s Portable Concrete Barrier with a Free-Standing Configuration – Test No. NJPCB-3 (NEW) New Jersey Department of Transportation NJPCB-3 TRP-03-355-18 2018-12-11
Performance Evaluation of New Jersey’s Portable Concrete Barrier with a Pinned Configuration and Grouted Toes – Test No. NJPCB-1 (NEW) New Jersey Department of Transportation NJPCB-1 TRP-03-338-18 2018-12-06
MASH TL-3 Evaluation of the Unreinforced, Single-Slope Concrete Median Barrier (NEW) Ohio Department of Transportation OSSB-1 TRP-03-388-18 2018-11-19
MASH 2016 Evaluation of a Non-Proprietary Type III Barricade SWZDI WZNP-1 TRP-03-394-18 Revision-1 2018-09-19
Data-Driven Development of a Roadside Safety Marketing Campaign for Tree Removal - Phase I Midwest States Regional Pooled Fund Program TRP-03-375-18 2018-07-17
Phase II Evaluation of Floor Pan Tearing for Cable Barrier Systems Midwest States Regional Pooled Fund Program TRP-03-359-18 2018-03-30
MASH Test No. 3-10 of a Non-Proprietary, High-Tension, Cable Median Barrier for Use in 6H:1V V-Ditch (Test No. MWP-9) Midwest States Regional Pooled Fund Program MWP-9 TRP-03-360-18 2018-03-30
Increased Span Length for the MGS Long-Span Guardrail System Part III: Failure Analysis Midwest States Regional Pooled Fund Program TRP-03-362-17 2017-09-29
Development of a Transition Between Free-Standing and Reduced-Deflection Portable Concrete Barriers – Phase I Wisconsin Department of Transportation TRP-03-366-17 2017-08-08
Safety Investigation and Design Guidance for Curbs Near Energy-Absorbing End Terminals Wisconsin Department of Transportation TRP-03-358-17 2017-07-10
Phase II Vehicle Dynamics Testing of Roadside Rock Liners Wisconsin Department of Transportation RDL-1 TRP-03-364-17 2017-07-10
Placement of Breakaway Light Poles Located Directly Behind Midwest Guardrail System (MGS) Illinois Tollway ILT-1
ILT-2
TRP-03-361-17 2017-06-29
Evaluation of Floorpan Tearing and Cable Splices for Cable Barrier Systems Midwest States Regional Pooled Fund Program TRP-03-324-17 2017-05-16
MASH Test No. 3-10 of a Non-Proprietary, High-Tension, Cable Median Barrier for Use in 6H:1V V-Ditch (Test No. MWP-8) Midwest States Regional Pooled Fund Program MWP-8 TRP-03-331-17 2017-05-10
Length of Need and Minimum System Length for F-Shape Portable Concrete Barrier Nebraska Department of Roads,SWZDI,Federal Highway Administration NELON-1 NELON-2 TRP-03-337-17 2017-05-03
Testing and Evaluation of MASH TL-3 Transition Between Guardrail and Portable Concrete Barriers Nebraska Department of Roads,SWZDI,Federal Highway Administration MGSPCB-1
MGSPCB-2
MGSPCB-3
TRP-03-335-17 2017-05-02
Increased Span Length for the MGS Long-Span Guardrail System Part II: Full-Scale Crash Testing Midwest States Regional Pooled Fund Program MGSLS-1
MGSLS-2
TRP-03-339-17 2017-04-07
LS-DYNA® Modeling Enhancement Support Midwest States Regional Pooled Fund Program TRP-03-357-17 2017-04-06
Development of the Manitoba Constrained-Width, Tall Wall Barrier Manitoba Infrastructure MAN-1 TRP-03-356-16 2016-09-26
Development of a Transition Between an Energy-Absorbing Concrete Barrier and a Rigid Buttress Nebraska Department of Roads,Federal Highway Administration TRP-03-336-16 2016-09-26
Improved Methodologies in Modeling and Predicting Failure in AASHTO M-180 Guardrail Steel Using Finite Element Analysis – Phase I Nebraska Department of Roads,Federal Highway Administration TRP-03-333-16 2016-08-23
Midwest Guardrail System (MGS) Placed Adjacent to a 1V:2H Fill Slope with 6-ft Posts Midwest States Regional Pooled Fund Program MGSS-1 TRP-03-320-16 2016-08-22
MASH Test Nos. 3-11 and 3-10 on a Non-Proprietary Cable Median Barrier Midwest States Regional Pooled Fund Program MWP-4
MWP-6
MWP-7
TRP-03-327-16 2016-05-17
Phase III Demonstration of Ponderosa Pine Round Posts as Alternative to Rectangular SYP Posts in G4(2W) Guardrail Systems Arizona State Forestry Division,USDA Forest Products Lab,Arizona Log & Timber AZRP-1 TRP-03-329-15 2016-05-17
Continued Development of a Non-Proprietary, High-Tension, Cable End Terminal System Midwest States Regional Pooled Fund Program TRP-03-332-16 2016-04-29
Phase I Evaluation of Selected Concrete Material in LS-DYNA Nebraska Department of Roads,Federal Highway Administration TRP-03-330-16 2016-04-29
Cable-to-Post Attachments for Use in Non-Proprietary High-Tension Cable Median Barrier – Phase II Midwest States Regional Pooled Fund Program TRP-03-323-16 2016-03-24
Midwest Guardrail System (MGS) with an Omitted Post Midwest States Regional Pooled Fund Program MGSMP-1 TRP-03-326-16 2016-02-22
Development of a Crashworthy Pedestrian Rail Wisconsin Department of Transportation APR-1 APR-2 TRP-03-321-15 2016-01-18
Dynamic Post Testing Review Nebraska Department of Roads,Mid-America Transportation Center TRP-03-328-15 2015-12-15
MASH Test Nos. 3-17 and 3-11 on a Non-Proprietary Cable Median Barrier Midwest States Regional Pooled Fund Program MWP-1 MWP-2 MWP-3 TRP-03-303-15 2015-11-03
MASH TL-4 Crash Testing and Evaluation of the RESTORE Barrier Nebraska Department of Roads,Federal Highway Administration SFH-1 SFH-2 SFH-3 TRP-03-318-15 2015-11-03
Attachment of Combination Rails to Concrete Parapets Utilizing Epoxy Adhesive Anchors Iowa Department of Transportation TRP-03-325-15 2015-11-03
Development and Evaluation of Weak-Post W-Beam Guardrail in Mow Strips Midwest States Regional Pooled Fund Program MGSMS-1 TRP-03-322-15 2015-10-01
Conceptual Development of an Impact-Attenuation System for Intersecting Roadways Nebraska Department of Roads TRP-03-312-15 2015-09-30
MGS Dynamic Deflections and Working Widths at Lower Speeds Midwest States Regional Pooled Fund Program TRP-03-314-15 2015-09-29
Performance Characteristics of Posts Embedded in Soil TRP-03-301-15 2015-08-12
Design and Evaluation of an Energy-Absorbing, Reusable Roadside/Median Barrier Nebraska Department of Roads,Federal Highway Administration TRP-03-317-15 2015-07-29
Cable-to-Post Attachments for Use in Non-Proprietary High-Tension Cable Median Barrier - Phase II Midwest States Regional Pooled Fund Program TRP-03-313-15 2015-06-02
Design of an Improved Post for Use in a Non-Proprietary High-Tension Cable Median Barrier Midwest States Regional Pooled Fund Program TRP-03-286-15 2015-05-07
Development of Socketed Foundations for S3x5.7 Posts Midwest States Regional Pooled Fund Program TRP-03-293-15 2015-04-28
Phase II Ponderosa Pine Round-Post Equivalency Study USDA Forest Products Lab TRP-03-315-14 2015-02-04
Increased Span Length for the MGS Long-Span Guardrail System Midwest States Regional Pooled Fund Program TRP-03-310-14 2014-12-17
Roadside Grading Guidance - Phase II Wisconsin Department of Transportation TRP-03-269-14 2014-10-14
Phase I Assessment of Guardrail Length-of-Need Wisconsin Department of Transportation TRP-03-284-14 2014-08-12
Development of a Socketed Foundation for the Midwest Weak Post (MWP) V1 Midwest States Regional Pooled Fund Program TRP-03-298-14 2014-07-23
Dynamic Evaluation of MGS Stiffness Transition with Curb Midwest States Regional Pooled Fund Program MWTC-1 MWTC-2 MWTC-3 TRP-03-291-14 2014-06-30
Development of MASH TL-3 Transition Between Guardrail and Portable Concrete Barriers Nebraska Department of Roads,Smart Work Zone Deployment Initiative,Federal Highway Administration TRP-03-300-14 2014-06-26
Predicting the Dynamic Fracture of Steel via a Non Local Strain- Energy Density Failure Criterion Nebraska Department of Roads TRP-03-311-14 2014-06-23
Cable Guardrail with Strong J-Bolts New York State Department of Transportation NYJ-1
NYJ-2
NYJ-3
TRP-03-299-14 2014-05-29
Universal Breakaway Steel Post for Other Applications Midwest States Regional Pooled Fund Program TRP-03-288-14 2014-04-01
Development of a Retrofit, Low-Deflection, Temporary Concrete Barrier System Wisconsin Department of Transportation RDTCB-1
RDTCB-2
TRP-03-295-14 2014-03-31
Extending TL-2 Short-Radius Guardrail to Larger Radii Wisconsin Department of Transportation TRP-03-296-14 2014-03-31
Dynamic Testing of a Non-Proprietary, High-Tension, Cable End Terminal System Midwest States Regional Pooled Fund Program TRP-03-294-14 2014-03-21
Zone of Intrusion for Permanent 9.1-Degree Single-Slope Concrete Barriers Wisconsin Department of Transportation TRP-03-292-13 2014-03-14
Midwest Guardrail System (MGS) Implementation Midwest States Regional Pooled Fund Program 2014-02-19
Safety Performance Evaluation of Weak-Post, W-Beam Guardrail Attached to Culvert Midwest States Regional Pooled Fund Program TRP-03-277-14 2014-02-12
Evaluation of Energy Absorbers for Use in a Roadside/Median Barrier Nebraska Department of Roads,Federal Highway Administration TRP-03-280-14 2014-02-06
Phase I Ponderosa Pine Round Post Equivalency Study USDA Forest Products Lab,Arizona Log & Timber TRP-03-287-13 2013-11-22
Downstream Anchoring Requirements For The Midwest Guardrail System Wisconsin Department of Transportation WIDA-1
WIDA-2
TRP-03-279-13 2013-10-28
Midwest Guardrail System (MGS) With Southern Yellow Pine Posts Midwest States Regional Pooled Fund Program MGSSYP-1
MGSSYP-2
TRP-03-272-13 2013-09-04
Design Of Cable-To-Post Attachments For Use In A Non-Proprietary, High-Tension, Cable Median Barrier Midwest States Regional Pooled Fund Program TRP-03-285-13 2013-08-29
Post Weld And Epoxy Anchorage Variations For W-Beam Guardrail Attached To Low-Fill Culverts Midwest States Regional Pooled Fund Program TRP-03-278-13 2013-08-12
Minimum Effective Guardrail Length For The MGS Wisconsin Department of Transportation MGSMIN-1 TRP-03-276-13 2013-08-12
Development Of A New Energy-Absorbing Roadside/Median Barrier System With Restorable Elastomer Cartridges Nebraska Department of Roads,Federal Highway Administration TRP-03-281-13 2013-07-16
Cable Median Barrier Failure Analysis and Remediation Phase II Midwest States Regional Pooled Fund Program TRP-03-319-13 2013-06-20
Energy Analysis of Vehicle-to-Cable Barrier Impacts New York State Department of Transportation TRP-03-283-13 2013-06-11
Cost-Effective Treatment of Existing Guardrail Systems Midwest States Regional Pooled Fund Program TRP-03-254-13 2013-05-05
Evaluation of the New York Low-Tension Three-Cable Barrier on Curved Alignment New York State Department of Transportation NYCC-1
NYCC-2
NYCC-3
TRP-03-263-12 2013-02-19
Dynamic Evaluation of the Powell Contracting LTD. Temporary Concrete Barrier Powell Contracting Ltd. PCMB-1 TRP-03-273-12 2013-01-25
Safety Performance Evaluation of the Non-blocked Midwest Guardrail System (MGS) Midwest States Regional Pooled Fund Program MGSNB-1
MGSNB-2
TRP-03-262-12 2013-01-24
Dynamic Testing of MGS W6x8.5 Posts at Decreased Embedment Nebraska Department of Roads TRP-03-271-12 2012-12-17
Cable Median Barrier Failure Analysis and Prevention Mid-America Transportation Center TRP-03-275-12 2012-12-17
Determination of the Maximum MGS Mounting Height - Phase II Detailed Analysis with LS-DYNA Midwest States Regional Pooled Fund Program TRP-03-274-12 2012-12-05
Evaluation of a Non-Proprietary, High-Tension, Four-Cable Median Barrier on Level Terrain Midwest States Regional Pooled Fund Program 4CMBLT-1 TRP-03-258-12 2012-11-29
Development of a Design Procedure for Concrete Traffic Barrier Attachments to Bridge Decks Utilizing Epoxy Concrete Anchors Wisconsin Department of Transportation TRP-03-264-12 2012-11-26
Cost-Effective Safety Treatments for Low-Volume Roads Midwest States Regional Pooled Fund Program TRP-03-222-12 2012-08-24
Safety Investigation and Guidance for Retrofitting Existing Approach Guardrail Transitions Wisconsin Department of Transportation TRP-03-266-12 2012-08-21
Development and Recommendations for a Non-Proprietary, High-Tension, Cable End Terminal System Midwest States Regional Pooled Fund Program TRP-03-268-12 2012-07-17
Test Matrices for Evaluating Cable Median Barriers Placed in V-Ditches Midwest States Regional Pooled Fund Program TRP-03-265-12 2012-07-13
Improved Models of Cable-to-Post Attachments for High-Tension Cable Barriers Midwest States Regional Pooled Fund Program TRP-03-267-12 2012-05-25
Phase II Development of a Non-Proprietary, Four-Cable, High Tension Median Barrier Midwest States Regional Pooled Fund Program 4CMB-4
4CMB-5
TRP-03-253-12 2012-03-21
Synthesis of Crash Cushion Guidance Wisconsin Department of Transportation TRP-03-252-12 2012-03-20
Determination of the Maximum MGS Mounting Height - Phase I Crash Testing Midwest States Regional Pooled Fund Program MGSMRH-1
MGSMRH-2
TRP-03-255-12 2012-03-09
Phase I Development of an Aesthetic, Precast Concrete Bridge Rail Nebraska Department of Roads TRP-03-239-12 2012-02-13
Development of a Socketed Foundation for Cable Barrier Posts-Phase I Midwest States Regional Pooled Fund Program,Mid-America Transportation Center TRP-03-232-11 (MATC-UNL-222) 2012-02-01
Investigation and Dynamic Testing of Wood and Steel Posts for MGS on a Wire-Faced, MSE Wall Federal Highway Administration, Central Federal Lands Highway Division TRP-03-231-11 2012-02-01
Development of an Economical Guardrail System for use on Wire-Faced, MSE Walls Federal Highway Administration, Central Federal Lands Highway Division MGSGW-1
MGSGW-2
TRP-03-235-11 2012-02-01
Phase II Continued Investigation and Dynamic Testing of Wood Posts for use on a Wire-Faced MSE Wall Federal Highway Administration, Central Federal Lands Highway Division TRP-03-256-12 2012-02-01
Phase I Development of a Non-Proprietary, Four-Cable, High Tension Median Barrier Midwest States Regional Pooled Fund Program 4CMB-1
4CMB-2
4CMB-3
TRP-03-213-11 2011-12-28
Roadside Grading Guidance-Phase I Wisconsin Department of Transportation TRP-03-251-11 2011-12-19
Evaluation of the In-Service Safety Performance of Safety-Shape and Vertical Concrete Barriers Midwest States Regional Pooled Fund Program TRP-03-259-11 2011-12-16
Development of Alternative Wood-Post MGS Approach Guardrail Transition Midwest States Regional Pooled Fund Program TRP-03-243-11 2011-11-28
Crash Testing of Various Erosion Control Features - Phase I: Preliminary Guidelines Wisconsin Department of Transportation TRP-03-249-11 2011-11-28
Performance Evaluation of Brass Breakaway Couplings Midwest States Regional Pooled Fund Program TRP-03-248-10 2011-05-31
Design and Evaluation of a High-Tension Cable Median Barrier Attachment Midwest States Regional Pooled Fund Program TRP-03-228-11 2011-05-11
Evaluation of the Midwest Guardrail System (MGS) with White Pine Wood Posts Wisconsin Department of Transportation MGSWP-1 TRP-03-241-11 2011-03-28
Development of the MGS Approach Guardrail Transition Using Standardized Steel Posts Midwest States Regional Pooled Fund Program MWTSP-1
MWTSP-2
MWTSP-3
TRP-03-210-10 2010-12-21
Investigating the Use of a New Universal Breakaway Steel Post-Phase 3 Midwest States Regional Pooled Fund Program USPBN-3
USPBN-4
TRP-03-244-10 2010-12-16
Dynamic Impact Testing of Wood Posts for the Midwest Guardrail System (MGS) Placed Adjacent to a 2H:1V Fill Slope Midwest States Regional Pooled Fund Program TRP-03-234-10 2010-12-16
Performance Limits for 6-in. (152-mm) High Curbs Placed in Advance of the MGS using Mash Vehicles Part III: Full-Scale Crash Testing (TL-2) Midwest States Regional Pooled Fund Program MGSC-6 TRP-03-237-10 2010-11-24
Zone of Intrusion Study Florida Department of Transportation TRP-03-242-10 2010-10-15
Review of State DOT Guardrail Construction Practices and Policies Federal Highway Administration TRP-03-240-10 2010-09-30
Update to Cable Barrier Literature Review Midwest States Regional Pooled Fund Program TRP-03-227-10 2010-08-12
Development of a Low-Cost, Energy-Absorbing Bridge Rail Midwest States Regional Pooled Fund Program MGSBR-1
MGSBR-2
TRP-03-226-10 2010-08-11
Investigating the Use of a New Universal Breakaway Steel Post-Phase 2 Minnesota Department of Transportation USPBN-2 TRP-03-230-10 2010-08-09
Development of Advanced Finite Element Material Models for Cable Barrier Wire Rope Mid-America Transportation Center TRP-03-233-10 (MATC-UNL-220) 2010-08-02
Development of a Temporary Concrete Barrier to Permanent Concrete Median Barrier Approach Transition Midwest States Regional Pooled Fund Program TCBT-1
TCBT-2
TRP-03-208-10 2010-07-15
Foundation Design for High Tension Cable Guardrails Mid-America Transportation Center TRP-03-236-10 (MATC-UNL-101) 2010-06-01
Safety Investigation and Guidance for Work-Zone Devices in Freight Transportation Systems Subjected to Passenger Car and Truck Impacts with New Crash Standards Mid-America Transportation Center,Smart Work Zone Deployment Initiative WZ09-1
WZ09-2
WZ09-3
WZ09-4
TRP-03-225-10 (MATC-UNL-100) 2010-03-01
Development and Evaluation of the Midwest Guardrail System (MGS) Placed Adjacent to a 2:1 Fill Slope Midwest States Regional Pooled Fund Program MGS221-1
MGS221-2
TRP-03-185-10 2010-02-24
Dynamic Evaluation of a Pinned Anchoring System for New York State's Temporary Concrete Barriers - Phase II New York State Department of Transportation NYTCB-5 TRP-03-224-10 2010-01-27
Performance Evaluation of Type II and Type IIA Box Beam End Terminals New York State Department of Transportation NYBBT-1
NYBBT-2
NYBBT-3
NYBBT-4
NYBBT-5
NYBBT-6
NYBBT-7
NYBBT-8
NYBBT-9
TRP-03-203-10 2010-01-20
Dynamic Evaluation of New York State's Aluminum Pedestrian Signal Pole System New York State Department of Transportation TRP-03-223-09 2009-12-22
Termination and Anchorage of Temporary Concrete Barriers Midwest States Regional Pooled Fund Program TTCB-1 TRP-03-209-09 2009-10-29
Development and Testing of a New Vertical-Faced Temporary Concrete Barrier for use on Composite Panel Bridge Decks Kansas Department of Transportation KSFRP-1 TRP-03-220-09 2009-10-13
Performance Limits for 6-in. (152-MM) High Curbs Placed in Advance of the MGS using Mash Vehicles Part II: Full-Scale Crash Testing Midwest States Regional Pooled Fund Program MGSC-5 TRP-03-221-09 2009-09-30
Dynamic Evaluation of a Pinned Anchoring System for New York State's Temporary Concrete Barriers New York State Department of Transportation NYTCB-4 TRP-03-216-09 2009-09-08
Development of a TL-2 Steel Bridge Railing and Transition for use on Transverse, Nail-Laminated, Timber Bridges West Virginia Department of Transportation TRP-03-212-09 2009-08-13
Investigating the Use of a New Universal Breakaway Steel Post Minnesota Department of Transportation USPBN-1 TRP-03-218-09 2009-08-03
Identification of Vehicular Impact Conditions Associated with Serious Ran-Off-Road Crashes, Vol I, II National Cooperative Highway Research Program TRP-03-219-09 2009-05-07
Development of a TL-1 Timber, Curb-type, Bridge Railing for use on Transverse, Nail-Laminated, Timber Bridges West Virginia Department of Transportation WVBR-1 TRP-03-211-09 2009-05-06
Analysis, Design, and Dynamic Evaluation of a TL-2 Rough Stone Masonry Guardwall Federal Highway Administration RSMG-1
RSMG-2
TRP-03-217-09 2009-05-06
Performance Limits for 152-mm (6-in.) High Curbs placed in advance of the MGS using MASH-08 Vehicles Part I: Vehicle-Curb Testing and LS-DYNA Analysis Midwest States Regional Pooled Fund Program MGSC-1
MGSC-2
MGSC-3
MGSC-4
TRP-03-205-09 2009-05-06
Evaluation of Safety Treatments for Roadside Culverts Iowa Department of Transportation TRP-03-201-09 2009-04-24
Cable Median Barrier Guidelines Midwest States Regional Pooled Fund Program TRP-03-206-08 2009-03-04
Analysis of Existing Work-Zone Devices with MASH Safety Performance Criteria Mid-America Transportation Center,SWZDI WZ09-1
WZ09-2
WZ09-3
WZ09-4
TRP-03-225-10 (SWZDI Version) 2009-02-04
Design and Evaluation of a Low-Tension Cable Median Barrier System Midwest States Regional Pooled Fund Program CMB-1
CMB-2
CMB-3
TRP-03-195-08 2008-12-08
Approach Slope for Midwest Guardrail System Midwest States Regional Pooled Fund Program MGSAS-1
MGSAS-2
TRP-03-188-08 2008-12-04
Performance Evaluation of Safety Grates for Cross-Drainage Culverts Midwest States Regional Pooled Fund Program KSCG-1
KSCG-2
TRP-03-196-08 2008-10-23
Guidelines for Guardrail Implementation National Cooperative Highway Research Program TRP-03-207-08 2008-09-26
Design and Evaluation of a Low-Tension Cable Guardrail End Terminal System Midwest States Regional Pooled Fund Program CT-1
CT-2
CT-3
CT-4
TRP-03-131-08 2008-07-15
Evaluation of Critical Flare Rates for the Midwest Guardrail System (MGS) Midwest States Regional Pooled Fund Program FR-1
FR-2
FR-3
FR-4
FR-5
TRP-03-191-08 2008-07-15
Development of a Stand-Alone Concrete Bridge Pier Protection System Midwest States Regional Pooled Fund Program CBPP-1 TRP-03-190-08 2008-04-18
Dynamic Impact Testing of CRT Wood Posts in a Rigid Sleeve Minnesota Department of Transportation TRP-03-198-08 2008-04-11
Aesthetic Barrier Literature Review Federal Highway Administration TRP-03-197-07 2008-04-10
Evaluation of Box Beam Stiffening of Unanchored Temporary Concrete Barriers New York State Department of Transportation NYTCB-1
NYTCB-2
NYTCB-3
TRP-03-202-08 2008-03-14
Evaluation of a Modified Three Cable Guardrail Adjacent to Steep Slope Midwest States Regional Pooled Fund Program CS-2 TRP-03-192-08 2008-03-04
Phase IV Development of a Short-Radius Guardrail for Intersecting Roadways Midwest States Regional Pooled Fund Program SR-7
SR-8
TRP-03-199-08 2008-02-29
Design and Evaluation of High-Tension Cable Median Barrier Hardware Midwest States Regional Pooled Fund Program TRP-03-200-08 2008-02-25
Evaluation of Rigid Hazards Placed in the Zone of Intrusion Midwest States Regional Pooled Fund Program ZOI-1
ZOI-2
ZOI-3
TRP-03-151-08 2008-01-03
Dynamic Impact Testing of S76X8.5 (S3X5.7) Steel Posts for Use in Cable Guardrail Systems Midwest States Regional Pooled Fund Program TRP-03-186-07 2007-12-19
Development of a TL-5 Vertical Faced Concrete Median Barrier Incorporating Head Ejection Criteria Midwest States Regional Pooled Fund Program TL5CMB-2 TRP-03-194-07 2007-12-10
Phase III Development of a Short-Radius Guardrail for Intersecting Roadways Midwest States Regional Pooled Fund Program SR-5
SR-6
TRP-03-183-07 2007-12-06
Development of the Midwest Guardrail System (MGS) W-Beam to Thrie Beam Transition Element Midwest States Regional Pooled Fund Program MWT-3
MWT-4
MWT-5
MWT-6
TRP-03-167-07 2007-11-26
Midwest Guardrail System for Long-Span Culvert Applications LSC-1
LSC-2
TRP-03-187-07 2007-11-16
Evaluation of an Existing Steel Post Alternative for the Thrie Beam Bullnose Guardrail System Midwest States Regional Pooled Fund Program SBN-1
SBN-2
TRP-03-193-07 2007-08-24
Evaluation of a New Jersey Safety Shape, Segmented Concrete Barrier for use on Composite Panel Bridge Decks Midwest States Regional Pooled Fund Program KSC-1 TRP-03-181-07 2007-06-05
Dynamic Component Testing of Potential Alternative Anchors for the F-Shape Temporary Concrete Barrier Steel Strap Tie-Down System Nebraska Department of Roads TRP-03-182-07 (TCB Steel Strap) 2007-04-09
Investigating the use of Small-Diameter Softwood as Guardrail Posts (Dynamic Test Results) U.S. Department of Agriculture MGSDF-1
MGSPP-1
TRP-03-179-07 2007-03-28
Dynamic Impact Testing of W152x13.4 (W6x9) Steel Posts on a 2:1 Slope Midwest States Regional Pooled Fund Program TRP-03-165-07 2007-03-23
Development of a Tie-Down and Transition Systems for Temporary Concrete Barrier on Asphalt Road Surfaces Midwest States Regional Pooled Fund Program FTB-1
FTB-2
TRP-03-180-06 2007-02-23
Design and Evaluation of an Open Combination Traffic/Bicycle Bridge Railing System Midwest States Regional Pooled Fund Program MOBR-1
MOBR-2
TRP-03-162-07 2007-02-09
Safety Performance Evaluation of Minnesota's Temporary Rigid Panel Sign Stand Systems Midwest States Regional Pooled Fund Program TRP-03-166-07 2007-02-08
Performance Evaluation of the Permanent New Jersey Safety Shape Barrier - Update to NCHRP 350 Test No. 4-12 (2214NJ-2) National Cooperative Highway Research Program 2214NJ-2 TRP-03-178-06 2006-10-13
Performance Evaluation of the Permanent New Jersey Safety Shape Barrier - Update to NCHRP 350 Test No. 3-10 (2214NJ-1) New Jersey Department of Transportation 2214NJ-1 TRP-03-177-06 2006-10-13
Performance Evaluation of the SKT-MGS Tangent End Terminal - Update to NCHRP 350 Test No. 3-34 (2214TT-1) National Cooperative Highway Research Program 2214TT-1 TRP-03-176-06 2006-10-12
Performance Evaluation of the Guardrail to Concrete Barrier Transition - Update to NCHRP 350 Test No. 3-21 with 28 National Cooperative Highway Research Program 2214T-1 TRP-03-175-06 2006-10-12
Performance Evaluation of the Free-Standing Temporary Barrier - Update to NCHRP 350 Test No. 3-11 with 28 National Cooperative Highway Research Program 2214TB-2 TRP-03-174-06 2006-10-12
Performance Evaluation of the Midwest Guardrail System - Update to NCHRP 350 Test No. 3-10 (2214MG-3) National Cooperative Highway Research Program 2214MG-3 TRP-03-172-06 2006-10-11
Performance Evaluation of the Midwest Guardrail System - Update to NCHRP 350 Test No. 3-11 with 28" C.G. Height (2214MG-2) National Cooperative Highway Research Program 2214MG-2 TRP-03-171-06 2006-10-11
Performance Evaluation of the Free-Standing Temporary Barrier-Update to NCHRP 350 Test No. 3-11 (2214TB-1) National Cooperative Highway Research Program 2214TB-1 TRP-03-173-06 2006-10-11
Performance Evaluation of the Midwest Guardrail System - Update to NCHRP 350 Test No. 3-11 (2214MG-1) National Cooperative Highway Research Program 2214MG-1 TRP-03-170-06 2006-10-10
Performance Evaluation of the Modified G4(1S) Guardrail - Update to NCHRP 350 Test No. 3-11 with 28 National Cooperative Highway Research Program 2214WB-2 TRP-03-169-06 2006-10-09
Performance Evaluation of the Modified G4(1S) Guardrail - Update to NCHRP 350 Test No. 3-11 (2214WB-1) National Cooperative Highway Research Program 2214WB-1 TRP-03-168-06 2006-10-06
Development of the GC-8000 Bridge Railing and Transition U.S. Department of Agriculture FSCR-1
FSCR-2
FSCR-3
FSCR-4
TRP-03-161-06 2006-05-02
Development, Testing, and Evaluation of NDOR's TL-5 Aesthetic Open Concrete Bridge Rail Nebraska Department of Roads ACBR-1 TRP-03-148-05 2005-12-01
Safety Performance Evaluation of Missouri's Ground-Mounted Temporary Sign Stands - Phase II Missouri Highway and Transportation Department M-3 TRP-03-158-05 2005-03-08
Design and Evaluation of Minnesota's Timber Rub-Rail for Noise Barriers Minnesota Department of Transportation MNTR-1 TRP-03-156-05 2005-03-08
Evaluation of Alternate Cable Anchor Designs and Three-Cable Guardrail Adjacent to Steep Slope Midwest States Regional Pooled Fund Program CS-1 TRP-03-155-05 2005-02-03
Critical Flare Rates for W-Beam Guardrail-Determining Maximum Capacity using Computer Simulation NCHRP 17-20(3) National Cooperative Highway Research Program TRP-03-157-04 2005-01-24
Dynamic Testing of Wooden Guardrail Posts-White and Red Pine Species Equivalency Study Midwest States Regional Pooled Fund Program TRP-03-154-04 2004-09-21
Development of the Midwest Guardrail System (MGS) for Standard and Reduced Post Spacing and in combination with curbs Midwest States Regional Pooled Fund Program NPG-1
NPG-2
NPG-3
NPG-4
NPG-5
NPG-6
TRP-03-139-04 2004-09-01
TL-5 Development of 42-and 51-in. Tall, Single-Faced, F-Shape Concrete Barriers Midwest States Regional Pooled Fund Program TRP-03-149-04 2004-04-30
Safety Performance Evaluation of the Nebraska Open Bridge Rail on an Inverted Tee Bridge Deck Nebraska Department of Roads NIT-1 TRP-03-133-04 2004-01-21
Cable Guardrail End Terminal Simulation FHWA Center of Excellence in DYNA3D Analysis Federal Highway Administration TRP-03-142-03 2003-10-30
Testing of M203x9.7 (M8x6.5) and S76x8.5 (S3x5.7) Steel Posts-Post Comparison Study for the Cable Median Barrier Midwest States Regional Pooled Fund Program TRP-03-143-03 2003-10-24
Phase II Development of a Short-Radius Guardrail for Intersecting Roadways Midwest States Regional Pooled Fund Program SR-1
SR-2
SR-3
SR-4
TRP-03-137-03 2003-09-09
Development and Evaluation of a Tie-Down System for the Redesigned F-Shape Concrete Temporary Barrier Midwest States Regional Pooled Fund Program KTB-1 TRP-03-134-03 2003-08-22
Safety Performance Evaluation of Michigan's 4x5 Portable Sign Support Michigan Department of Transportation MI-4 TRP-03-135-03 2003-06-20
Deflection Limits for Temporary Concrete Barriers Midwest States Regional Pooled Fund Program TRP-03-113-03 2003-06-18
Testing of W152x23.8 (W6x16) Steel Posts-Soil Embedment Depth Study for the Midwest Guardrail System (Non-Proprietary Guardrail System) Midwest States Regional Pooled Fund Program TRP-03-136-03 2003-06-12
Development of a Steel H-Section Temporary Barrier for Use in Limited Deflection Applications Midwest States Regional Pooled Fund Program HTB-1
HTB-2
TRP-03-120-03 2003-05-30
Development of Standards for Placement of Steel Guardrail Posts in Rock Midwest States Regional Pooled Fund Program PR-1 TRP-03-119-03 2003-05-30
Performance Analysis of Welch Products Recycled Rubber Spacer Block Midwest States Regional Pooled Fund Program TRP-03-132-03 2003-03-16
Two Test Level 2 Bridge Railing and Transition Systems for Transverse Glue-Laminated Timber Decks U.S. Department of Agriculture STCR-1
STCR-2
WRBP-1
WRBP-2
TRP-03-125-03 2003-03-11
Guidelines for Attachments to Bridge Rails and Median Barriers Midwest States Regional Pooled Fund Program TRP-03-098-03 2003-02-26
Bridge Rails and Transitions for Pedestrian Protection Midwest States Regional Pooled Fund Program TRP-03-127-03 2003-02-20
Embankment Widening and Slopes for Energy Absorbing End Terminals Midwest States Regional Pooled Fund Program TRP-03-126-02 2003-02-07
Safety Performance Evaluation of Michigan's Temporary Traffic Control Devices Michigan Department of Transportation MI-1
MI-2
MI-3
TRP-03-128-02 2003-01-27
Safety Performance Evaluation of Minnesota's Low-Height, Temporary Rigid Panel Sign Stand Midwest States Regional Pooled Fund Program TRP-03-129-03 2003-01-23
Dynamic Impact Testing of S 75 x 8.5 Steel Posts (Cable Barrier Posts) Midwest States Regional Pooled Fund Program TRP-03-117-02 2002-11-15
NCHRP 350 Development and Testing of a Guardrail Connection to Low-Fill Culverts Midwest States Regional Pooled Fund Program KC-1
KC-2
TRP-03-114-02 2002-11-01
Analysis of Sign Attachments to Breakaway Luminaire Supports Midwest States Regional Pooled Fund Program TRP-03-122-02 2002-10-23
Development of a Low-Profile Bridge Rail for Test Level 2 Applications Midwest States Regional Pooled Fund Program LPBR-1 TRP-03-109-02 2002-08-20
Development of a Tie-Down System for Temporary Concrete Barriers Midwest States Regional Pooled Fund Program ITD-1 TRP-03-115-02 2002-08-16
Cable Barrier Literature Review Midwest States Regional Pooled Fund Program TRP-03-118-02 2002-07-10
Two Test Level 4 Bridge Railing and Transition Systems for Transverse Glue-Laminated Timber Decks U.S. Department of Agriculture STTR-1
STTR-2
STTR-3
STTR-4
TRBR-1
TRBR-2
TRBR-3
TRBR-4
TRP-03-071-01 2002-01-30
Safety Performance Evaluation of Minnesota's Aluminum Work Zone Signs Midwest States Regional Pooled Fund Program MNS-1
MNS-2
MNS-3
TRP-03-107-01 2002-01-29
Guardrail and Guardrail Terminals Installed Over Curbs - Phase II Midwest States Regional Pooled Fund Program NEC-2 TRP-03-105-00 2001-11-05
Safety Performance Evaluation of Missouri's Self-Driving Temporary Sign Stands Missouri Highway and Transportation Department M-1
M-2
TRP-03-097-00 2000-12-13
Crash Testing of Michigan's Type B (W-Beam) Guardrail System - Phase II Michigan Department of Transportation MIW-2 TRP-03-104-00 2000-12-13
Safety Performance Evaluation of Minnesota's Aluminum Type III Barricades Midwest States Regional Pooled Fund Program MNB-1
MNB-2
TRP-03-101-00 2000-10-19
Development of a W-Beam Guardrail System for use on a 2:1 Slope Midwest States Regional Pooled Fund Program MOSW-1 TRP-03-099-00 2000-10-16
Concept Development of a Short-Radius Guardrail System for Intersecting Roadways Midwest States Regional Pooled Fund Program TRP-03-100-00 2000-09-12
Crash Testing of Missouri's W-Beam to Thrie-Beam Transition Element Midwest States Regional Pooled Fund Program MWT-1
MWT-2
TRP-03-094-00 2000-09-12
Development of the TBC-8000 Bridge Railing U.S. Department of Agriculture FSTC-1 TRP-03-030-93 2000-09-05
Phase III Development of a Bullnose Guardrail System for Median Applications Midwest States Regional Pooled Fund Program MBN-5
MBN-6
MBN-7
MBN-8
MBN-9
TRP-03-095-00 2000-06-01
Guardrail and Guardrail Terminals Installed Over Curbs Midwest States Regional Pooled Fund Program NEC-1 TRP-03-083-99 2000-03-21
Development of an Approach Guardrail Transition Attached to a Thrie Beam and Channel Bridge Railing Midwest States Regional Pooled Fund Program MST-1
MST-2
TRP-03-091-99 2000-03-21
Crash Testing of Michigan's Type B (W-Beam) Guardrail System Michigan Department of Transportation MIW-1 TRP-03-090-99 1999-11-10
Development of a 7.62-m LONG SPAN GUARDRAIL SYSTEM-PHASE II Midwest States Regional Pooled Fund Program OLS-3 TRP-03-088-99 1999-08-13
Compliance Testing of Iowa's Skid-Mounted Sign Device Iowa Department of Transportation I-1
I-2
TRP-03-086-99 1999-07-23
Dynamic Impact Testing of Guardrail Posts Embedded in Soil Federal Highway Administration TRP-03-077-98 1999-07-21
Critical Impact Points for Crash Testing Transitions Federal Highway Administration TRP-03-084-99 1999-04-16
Development of a 7.62-m Long Span Guardrail System Midwest States Regional Pooled Fund Program OLS-1
OLS-2
TRP-03-072-99 1999-04-06
Phase II Development of a Bullnose Guardrail System for Median Applications Midwest States Regional Pooled Fund Program MBN-3
MBN-4
TRP-03-078-98 1998-12-18
Crash Testing of South Dakota's Cable Guardrail to W-Beam Transition South Dakota Department of Transportation SDC-1
SDC-2
SDC-3
TRP-03-080-98 1998-12-04
Design and Evaluation of the TL-4 Minnesota Combination Traffic/Bicycle Bridge Rail Midwest States Regional Pooled Fund Program MNPD-1
MNPD-2
TRP-03-074-98 1998-11-30
Concept Development of a Bullnose Guardrail System for Median Applications Midwest States Regional Pooled Fund Program MBN-1
MBN-2
TRP-03-073-98 1998-05-22
Two Approach Guardrail Transitions for Concrete Safety Shape Barriers Midwest States Regional Pooled Fund Program ITNJ-1 ITNJ-2 ITNJ-3 ITNJ-4 TRP-03-069-98 1998-05-15
NCHRP Report 350 Evaluation of the Nebraska Thrie-Beam Transition Nebraska Department of Roads NEBT-1 TRP-03-070-98 1998-05-01
Development of a Temporary Barrier System for Off-Road Applications Midwest States Regional Pooled Fund Program KTS-1 TRP-03-066-98 1998-03-01
A Review of Breakaway Supports for Small Signs and Mailbox Installations Midwest States Regional Pooled Fund Program TRP-03-068-98 1997-11-17
Guardrail Need for Embankments and Culverts Nebraska Department of Roads,Federal Highway Administration TRP-03-065-97 1997-06-01
Development of an Effective Flared Guardrail Terminal Midwest States Regional Pooled Fund Program KBCT-1 TRP-03-056-96 1997-06-01
Development of a Flexible Bridge Railing for Longitudinal Timber Decks U.S. Department of Agriculture LVBR-1
LVBR-2
TRP-03-062-96 1997-06-01
NCHRP Report 350 Compliance Testing of the BEST System Federal Highway Administration BEST-2
BEST-3
BEST-4
BEST-5
BEST-6
BEST-7
BEST-8
BEST-9
BEST-10
BEST-11
TRP-03-063-96 1996-12-04
Development of a TL-3 F-Shape Temporary Concrete Median Barrier Iowa Department of Transportation ITMP-1
ITMP-2
TRP-03-064-96 1996-12-01
Guardrail Testing Program II Final Report Volumes I and II Federal Highway Administration SBT-1
SBT-2
SBT-3
SBT-4
SBT-5
GWMP-1
GWMP-2
GWMP-3
FPAR-1
FPAR-2
FPAR-3
NTBR-1
NTBR-2
SBLR-1
SBLR-2
TRP-03-052-95 1996-09-01
Top-Mounted W-Beam Bridge Railing for Longitudinal Glulam Timber Decks Located on Low-Volume Roads U.S. Department of Agriculture LVBR-3 TRP-03-061-96 1996-09-01
Performance Level 2 Tests on a 29-in. Open Concrete Bridge Rail Midwest States Regional Pooled Fund Program NEOCR-3
NEOCR-4
NEOCR-5
NEOCR-6
TRP-03-051-95 1996-06-01
Development of Guardail Runout Length Calculation Procedures Nebraska Department of Roads,Federal Highway Administration TRP-03-057-96 1996-05-01
Performance Evaluation of KDOT W-Beam Systems, Volume I, II Midwest States Regional Pooled Fund Program KSWB-1
KSWB-2
KSWB-3
KSWB-4
TRP-03-039-96 1996-05-01
Design and Testing of a Breakaway Base for a Cluster Box Unit and a Neighborhood Delivery & Collection Unit United States Postal Service - Engineering TRP-03-055-96 1996-04-30
TL-1 Curb-Type Bridge Railing for Longitudinal Glulam Timber Decks Located on Low-Volume Roads U.S. Department of Agriculture CTBR-1 TRP-03-054-96 1996-04-01
Test Level 4 Evaluation of the Minnesota Combination Bridge Rail Minnesota Department of Transportation MN-1
MN-2
MN-3
MN-4
TRP-03-053-96 1996-03-01
Development and Testing of an Approach Guardrail Transition to a Single Slope Concrete Median Barrier Missouri Highway and Transportation Department MTSS-1
MTSS-2
TRP-03-047-95 1995-11-01
Evaluation of the Effect of Wood Quality on W-beam Guardrail Performance Nebraska Department of Roads TRP-03-060-96 1995-11-01
Performance Evaluation of a Dual Support Sign with Ground Mounted Pipe Posts and Multi-Directional Slip Bases Missouri Highway and Transportation Department MO2-1
MO2-2
TRP-03-050-95 1995-09-20
Design and Testing of a Dual Support Breakaway Sign Missouri Highway and Transportation Department MO3-1
MO3-2
TRP-03-048-95 1995-09-06
Safety Performance Evaluation of the Steel Backed Wood Rail to Bridge Rail Transition Federal Highway Administration SBT-1
SBT-2
SBT-3
SBT-4
SBT-5
TRP-03-049-95 1995-09-01
Safety Performance Evaluation of the George Washington Memorial Parkway Bridge Rail Federal Highway Administration GWMP-1
GWMP-2
GWMP-3
TRP-03-045-94 (GWMP) 1995-06-01
Crash Testing of Standard South Dakota Road Closure Gates South Dakota Department of Transportation SDG-1
SDG-2
TRP-03-044-94 1995-01-01
Concept Design and Analysis of Nebraska Turned-Down Approach Terminal Sections Midwest States Regional Pooled Fund Program TRP-03-045-95 (Turndown) 1995-01-01
Development of a Metal Cutting W-Beam Guardrail Terminal Federal Highway Administration MCS-1
MCS-2
MCS-3
MCS-4
MCS-5
MCS-6
MCS-7
TRP-03-043-94 1994-09-01
Performance Evaluation of NDOR Mountable Curbs Midwest States Regional Pooled Fund Program NEMC-1
NEMC-2
NEMC-3
NEMC-4
NEMC-5
NEMC-6
NEMC-7
NEMC-8
NEMC-9
NEMC-10
NEMC-11
NEMC-12
NEMC-13
NEMC-14
NEMC-15
NEMC-16
NEMC-17
NEMC-18
NEMC-19
NEMC-20
NEMC-21
NEMC-22
NEMC-23
TRP-03-037-94 1994-06-01
Performance Evaluation of Missouri's 6-in. Barrier Curb Under W-Beam Guardrail Midwest States Regional Pooled Fund Program MO6C-1 TRP-03-040-94 1994-04-01
Dynamic Evaluation of Missouri's Modified Bridge Anchor Section Missouri Highway and Transportation Department MBAS-1 TRP-03-038-93 1994-02-01
Safety Performance Evaluation of the Foothills Parkway Bridge Rail West Virginia Department of Transportation FPAR-1
FPAR-2
FPAR-3
TRP-03-041-94 1994-01-01
Development of Low-Volume Curb-Type Bridge Railings for Timber Bridge Decks U.S. Department of Agriculture LVCT-1a
LVCT-1b
LVCT-1c
LVCS-4
TRP-03-031-93 1993-12-01
Safety Performance Evaluation of a Modified Perforated Tension Fuse Plate for Dual Support Breakaway Signs Missouri Highway and Transportation Department MOBS-1
MOBS-2
TRP-03-033-92 1993-03-01
Safety Performance Evaluation of a Nested W-Beam with Half-Post Spacing Over a Low-Fill Culvert Midwest States Regional Pooled Fund Program 36-1 TRP-03-036-92 1993-03-01
Safety Performance Evaluation of the Steel-Backed Log Rail Federal Highway Administration SBLR-1
SBLR-2
TRP-03-035-92 1992-12-01
Safety Performance Evaluation on the Nebraska Turned-Down Approach Terminal Section Midwest States Regional Pooled Fund Program NETD-1 TRP-03-032-92 1992-10-01
AASHTO PL-1 Performance Level Crash Tests on the Natchez Trace Parkway Bridge Rail Federal Highway Administration NTBR-1
NTBR-2
TRP-03-034-92 1992-10-01
Performance Level 1 Tests on the Nebraska Open Concrete Bridge Rail Nebraska Department of Roads NEOCR-1
NEOCR-2
TRP-03-028-91 1992-02-01
Economic and Safety Considerations for Establishing Minimum Lateral Obstacle Clearance Policies for Utility Facilities in Nebraska Urban and Suburban Areas Nebraska Department of Roads TRP-03-022-90 1991-12-01
Performance Level 2 Tests on the Missouri 30 in. New Jersey Safety Shape Bridge Rail Missouri Highway and Transportation Department MS30-1
MS30-2
MS30-3
TRP-03-027-91 1991-11-01
Full-Scale 1,800 lb. Vehicle Crash Tests on a 4-Bolt Breakaway Slipbase Design Utah Department of Transportation USBLM-1
USBLM-2
TRP-03-025-91 1991-08-01
Full-Scale 18,000 lb. Vehicle Crash Test on the Kansas 32 inch Corral Rail Kansas Department of Transportation KSCR-1 TRP-03-026-91 1991-07-01
Full-Scale 4,500 lb. Vehicle Crash Test on the Permanent Precast Concrete Median Barrier Kansas Department of Transportation KCB-1 TRP-03-024-90 1991-03-01
Full-Scale 1,800 lb. Vehicle Crash Test on the Iowa W-Beam approach Guardrail to the Concrete Safety Shape Bridge Rail Federal Highway Administration,Iowa Department of Transportation I6-2 TRP-03-023-90 1991-02-01
Full-Scale 5,400 lb. Vehicle Crash Test on the Iowa W-Beam Approach Guardrail to the Concrete Safety Shape Bridge Rail Iowa Department of Transportation I6-1 TRP-03-021-90 1990-01-01
Full-Scale 18,000 lb. Vehicle Crash Test on the Iowa Retrofit Concrete Barrier Rail Iowa Department of Transportation,Federal Highway Administration I4-1
I4-2
TRP-03-019-90 1990-01-01
Full-Scale Vehicle Crash Test on the Iowa Steel Temporary Barrier Rail Iowa Department of Transportation I5-1 TRP-03-020-89 1989-12-01
Static Tests on Collapsing Guardrail Designs Nebraska Department of Roads TRP-03-018-89 1989-07-01
Full-Scale Vehicular Crash Testing of Experimental Signs on Barricade Structures New Jersey Department of Transportation 1
2
3
4
5
6
7
8
9
10
11
12
TRP-03-017-88 1989-06-01
Full-Scale Vehicle Crash Test on Nebraska Bridge Rail Barrier with a Modified New Jersey Shape Nebraska Department of Roads N-1 TRP-03-016-88 1989-03-01
Full-Scale Vehicle Crash Tests on the Iowa Retrofit Concrete Barrier Rail Iowa Department of Transportation I2-1
I2-2
I2-3
TRP-03-015-88 1989-01-01
Full-Scale Vehicle Crash Test on the Iowa Temporary Concrete Barrier Rail Half-Section Iowa Department of Transportation,Federal Highway Administration I3-1 TRP-03-014-88 1988-12-01
Comparative Study of Kansas and FHWA Guardrail Transition Designs using Barrier VII Computer Simulation Model Kansas Department of Transportation TRP-03-012-88 1988-12-01
Full-Scale Vehicle Crash Tests on the Iowa Box-Aluminum Bridge Rail Iowa Department of Transportation,Federal Highway Administration I1-1
I2-2
TRP-03-013-88 1988-11-01
Full-Scale Vehicle Crash Tests on Nebraska Rural Mailbox Designs Nebraska Department of Roads 1
2
3
4
TRP-03-009-87 1987-08-01
Full-Scale Vehicle Crash Tests on Guardrail-Bridgerail Transition Designs with Special Post Spacing Nebraska Department of Roads,Federal Highway Administration 1
2
3
4
5
6
TRP-03-008-87 1987-05-01
Cost-Effectiveness Comparison of Cable Guardrail vs. W-Beam Guardrail Nebraska Department of Roads TRP-03-007-82 (Cable Vs. W-Beam) 1982-08-01
Static and Full-Scale Vehicle Crash Tests of a Breakaway Wooden Utility Pole Federal Highway Administration 2-1
2-2
4-1
TRP-03-007-80 (Breakaway Utility Pole) 1982-01-01
Guardrail Utilization: Cost-Effectiveness Computer Program to Analyze W-Beam Guardrail on Fill Slopes Nebraska Department of Roads TRP-03-004-79 (Guardrail Utilization) 1980-06-01
Feasibility Study of Retrofitting Concrete Median Barriers Federal Highway Administration TRP-03-006-80 1980-05-30
Cost-Effectiveness of Guardrail-Bridgerail Transition Improvements: Double W-Beam versus Decreased Post Spacing Engineering Research Center,Nebraska Department of Roads TRP-03-003-79 1979-08-01
Feasibility Study of Breakaway Stub Concept for Wooden Utility Poles Engineering Research Center 1
2
3
TRP-03-005-79 1979-05-01
Cost-Effectiveness of Guardrail Improvements for Protecting Bridge Piers in Depressed Medians on Horizontal Curves Engineering Research Center TRP-03-002-78 1978-08-01
Cost-Effectiveness of Driveway Slope Improvements Engineering Research Center,Nebraska Department of Roads TRP-03-001-77 1977-08-01
GO BACK TO TOP


Contact Us:
130 Whittier Research Center
2200 Vine Street
Lincoln, Nebraska 68583-0853
(402) 472-0965
Email: mwrsf@unl.edu
Disclaimer:
The information contained on the Midwest Roadside Safety Facility (MwRSF) website is subject to change without prior notice. The University of Nebraska and the MwRSF is not responsible or liable, directly or indirectly, for any damage or loss caused or alleged to be caused by or in connection with the use or misuse of or reliance upon any such content, goods, or services available on this site.