Active Projects

Active Projects

Disclaimer: Projects can be sorted by Agency Code or Sponsoring Agency.

Project Title Agency Code ↓ Sponsoring Agency
Evaluation of New Jersey TCB Performance under MASH TL-3 TPF-5(193) Supplement 88 NJDOT
Guidelines for Placement of Breakaway Light Poles Behind Midwest Guardrail System TPF-5(193) Supplement 87 ILDOT
Phase II Conceptual Development of an Impact Attenuation System for Intersecting Roadways TPF-5(193) Supplement 86 NDOR
Annual Fee to Finish TF-13 and FHWA Standard Plans TPF-5(193) Supplement 85 Pooled Fund
Pooled Fund Center for Highway Safety TPF-5(193) Supplement 84 Pooled Fund
Annual Consulting Services Support TPF-5(193) Supplement 83 Pooled Fund
Tree Removal Marketing Program TPF-5(193) Supplement 82 Pooled Fund
Standardized Concrete Parapet for Attachment of Thrie Beam AGTs TPF-5(193) Supplement 81 Pooled Fund
MGS Guardrail with an Omitted Post TPF-5(193) Supplement 80 Pooled Fund
Transition from Free-Standing Temporary Barrier to Reduced-Deflection Temporary Barrier TPF-5(193) Supplement 78 WisDOT
Phase IIA Vehicle Dynamics Testing, Validation of Vehicle Models, and Computer Simulation of Rock Ditch Liners TPF-5(193) Supplement 77 WisDOT
Development of a TL-3 Transition between Temporary Concrete Barrier and Guardrail – Phase II TPF-5(193) Supplement 76, TPF-(295) Contract No. 16347 (SWZDI) NDOR
Length of Need for Free-Standing, F-Shape, Portable Concrete Barrier TPF-5(193) Supplement 75, TPF-(295) Contract No. 16346 (SWDZI) NDOR
Redesign of Low-Tension Cable Barrier Adjacent to Steep Slopes (NEW) TPF-5(193) Supplement 74 NDOR
Attachment of Combination Rails to Concrete Parapets Utilizing Epoxy Adhesive Anchors TPF-5(193) Supplement 73 IowaDOT
MGS Working Widths for Lower Speeds TPF-5(193) Supplement 69 Pooled Fund
Minimum Offset for Standard MGS Adjacent to 2H:1V Slope TPF-5(193) Supplement 68 Pooled Fund
Annual Fee to Finish TF-13 and FHWA Standard Plans TPF-5(193) Supplement 67 Pooled Fund
Pooled Fund Center for Highway Safety (NEW) TPF-5(193) Supplement 66 Pooled Fund
Safety Investigation & Design Guidance for Curb & Gutter Near Energy-Absorbing Terminals TPF-5(193) Supplement 62 WisDOT
MGS installed in Mow Strips and Other Un-yielding Pavements TPF-5(193) Supplement 57 Pooled Fund
Increased Span Length of the MGS Long Span TPF-5(193) Supplement 56 Pooled Fund
Annual LS-DYNA Modeling Enhancement Support TPF-5(193) Supplement 51 Pooled Fund
Crashworthy Pedestrian Rail TPF-5(193) Supplement 41 WisDOT
Continued Development and TL-4 Evaluation of Midwest Four-Cable, High-Tension, Median Barrier (NEW) TPF-5&rpar193&lpar Supplements 64 and 79 Pooled Fund
Test Title test code2 EngResearch