Is there currently a thrie beam transitions recommended to transition between modified thrie beam guardrail and concrete barrier? INDOT currently using the Standard Drawing E601-TMTT-01, see attachment or https://www.in.gov/dot/div/contracts/standards/drawings/sep25/600e/e600%20combined%20pdfs/E601-TMTT.pdf.
Would this transition be acceptable? If this transition was used in a median application, could we consider double siding the transition? Thank you
MwRSF provided recommendations for transitioning modified thrie beam in the Section 9.4 of the summary report for the modified thrie beam MASH compliance testing.
See link below.
https://mwrsf.unl.edu/researchhub/files/Report381/TRP-03-417-20.pdf
Thanks!