Do you have a piece of hardware that will handle the transition between two pinned-down temporary installations of pin & loop F-barriers over an expansion joint. The joint probably has a 7 to 10 inch throw. (See attached)
I spoke to Rory Meza and she showed me the Texas standard plan in which they simply cantilever one of the segments out over the joint. This would certainly allow for movement, but at full contraction, there would be a sizeable gap/snag point between the barriers, nor could the barriers be connected to one another. We've seen the state of Illinois use steel plates which cover the gap while one of the barriers slides independently. The plate is cast with studs into the other barrier.
This seems like a reasonable solution but I wondered how you have seen it handled.
Some parts of this site work best with JavaScript enabled.