Do you have a good solution for a new Bridge w/ 2" overlay the following year



A: Could we build the bridge approach section at 34” the first year?

or

B: Could we place a steel plate with a 2” offset below the bolts into the bridge where the 5 bolt pattern is.

then remove the following year when the overlay is placed



Approach Guardrail Transitions (AGTs)



Date March 7, 2016
Previous Views (117) Favorites (0)
Response
Response
(active)

On new construction, it would seem reasonable that one could install a concrete buttress with two different anchor patterns for the five end shoe bolts or studs, which allow for a 2” height adjustment. Some consideration could be given toward mitigating vehicle engine hood/quarter panel snag on the end of the new buttress after the approach thrie beam is lowered by 2” after one year of service. As such, there could be a downward slope or taper to reduce snag on the concrete corner. I like this option more than option A.

 

There also could be an option where a steel plate is used to make the switch, similar to the options discussed last winter.

 


Date March 8, 2016