Skip to main content
University
of
Nebraska–Lincoln
Log In
Search
Search
Submit
Close
Midwest Roadside Safety Facility
Menu
Search
Log In
Home
Who We Are
History
Faculty/Staff
Employment
Contact Us
Services
Testing
Finite Element Analysis
Design/Consulting
Pooled Fund
About
Member States
Active Projects
Members Only
Tech Transfer
Newsletters and Featured Research
Research Hub
AFB20 (user/password required)
Pooled Fund Q&A
Q&A Home
Ask a Question
Search Questions
Q&A Reports
Login
Q&A Home
Ask Us A Question
Search Answered Questions
Q&A Reports
Login
Nebraska
MwRSF
Q&A Home
Seach Q&A
View Q&A
View Q&A
Question on our BA-100 Standard Road Plan
Question
State
IA
Description Text
We have a situation due to the recent cold weather that the epoxy holding the pins in the pavement froze, well below 20 deg. It is unclear what pullout strength these pins will provide. Do you know what pullout strength would be required by the design? My assumption was that the pin mainly functions as a sheer device but Chris Poole told me it does serve a pullout propose too. We are trying to decide what length we need to go to correct the situation. The RCE is going to talk to the manufacture to see if the epoxy will develop sufficient strength once it is warmed up. If that does not turn out favorably and the pullout strength is important to the design, what would recommend to for correcting the problem with the barrier in place? Thank you in advance.
http://www.iowadot.gov/design/SRP/IndividualStandards/eba100.pdf
System Performance Evaluation
System Types
Permanent Concrete Barriers
Applications
System Features
Date
November 19, 2014
Previous Views (130) Favorites (0)
Attachment
BA-100.png
Response
Response
(active)
We have looked briefly at the attached detail and have some thoughts.
1. What test level is this barrier designed for?
2. In looking at the design, the height, width, and reinforcement of the barrier suggest that the barrier would likely be sufficient to withstand TL-3 and TL-4 level impacts without counting on contributions from the epoxy adhesive anchors. If TL-5 is the target, we would need to perform additional calculations regarding the capacity.
3. If it turns out that the epoxy will not set following a warm up and additional capacity is required, the simplest solution for providing additional capacity would be to provide a 2” deep asphalt keyway on each side of the barrier. We have done similar setups in the past and they have worked acceptably.
Let me know if you need more information.
Date
November 19, 2014
Previous Views (130) Favorites (0)
Response
Response
(active)
This is a TL-4 rail, so it sounds like we will be OK even if the epoxy does not make full strength. Thank you for getting back to me on this so quickly.