Skip to main content
University
of
Nebraska–Lincoln
Log In
Search
Search
Submit
Close
Midwest Roadside Safety Facility
Menu
Search
Log In
Home
Who We Are
History
Faculty/Staff
Employment
Contact Us
Services
Testing
Finite Element Analysis
Design/Consulting
Pooled Fund
About
Member States
Active Projects
Members Only
Tech Transfer
Newsletters and Featured Research
Research Hub
AFB20 (user/password required)
Pooled Fund Q&A
Q&A Home
Ask a Question
Search Questions
Q&A Reports
Login
Q&A Home
Ask Us A Question
Search Answered Questions
Q&A Reports
Login
Nebraska
MwRSF
Q&A Home
Seach Q&A
View Q&A
View Q&A
Wisconsin Barrier Design
Question
State
WI
Description Text
Wisconsin began by asking MwRSF to check the adequacy of a concrete barrier they had designed to meet the TL-4 impact condition. Initial calculations performed by MwRSF found that the barrier did not posses sufficient capacity to meet TL-4 as designed, MwRSF suggested some changes. After the suggested changes were determined to cost too much, they requested a new concrete barrier design. The concrete barrier was designed to be capable of being slip formed and attached to an existing roadway or shoulder using tie bars that could be inserted during the paving of the roadway. These bars are currently used in a similar manner to connect shoulder pavement to mainline pavement by WiDOT.
A TL-4 barrier designed was presented to Wisconsin, but it proved to be too costly. WiDOT then sought and received federal approval to lower their concrete barrier design to TL-3. It was still desired that the TL-3 version of the barrier be slip-formable and be capable to attachment to an existing roadway or shoulder with tie bars. The first TL-3 barrier was completed, but there were issues with the stirrups and the slip forming capabilities. The stirrups were then redesigned, allowing slip forming capabilities, but once again the design was too costly and it was abandoned by Wisconsin in favor of a past design.
System Performance Evaluation
System Types
Permanent Concrete Barriers
Applications
System Features
Date
August 31, 2005
Previous Views (16) Favorites (0)
Response
Response
(active)
See attached.
Date
August 31, 2005
Previous Views (16) Favorites (0)
Attachment
Wisconsin Barrier Design Summary.pdf
Some parts of this site work best with JavaScript enabled.