Skip to main content
University
of
Nebraska–Lincoln
Log In
Search
Search
Submit
Close
Midwest Roadside Safety Facility
Menu
Search
Log In
Home
Who We Are
History
Faculty/Staff
Employment
Contact Us
Services
Testing
Finite Element Analysis
Design/Consulting
Pooled Fund
About
Member States
Active Projects
Members Only
Tech Transfer
Newsletters and Featured Research
Research Hub
AFB20 (user/password required)
Pooled Fund Q&A
Q&A Home
Ask a Question
Search Questions
Q&A Reports
Login
Q&A Home
Ask Us A Question
Search Answered Questions
Q&A Reports
Login
Nebraska
MwRSF
Q&A Home
Seach Q&A
View Q&A
View Q&A
Down Stream Anchor TRP-03-279-13
Question
State
UT
Description Text
Utah created a down stream anchor standard drawing according the TRP-03-279-13 document for the Wisconsin DOT Project MGS with Standard Downstream Anchorage System. Our local fabricator has asked if a different strut can be used other than the strut that was tested with this system.
If that is a possibility I have attached a detail sheet of the proposed strut for your review and comment.
System Performance Evaluation
System Types
Road Closure Gates
Thrie Beam Guardrails
Applications
System Features
Date
March 16, 2017
Previous Views (124) Favorites (0)
Attachment
Strut & Yoke Assembly (1).pdf
Response
Response
(active)
The ground strut shown in the attached detail is similar to ones tested with previous end anchorage designs that were evaluated under NCHRP 230 and NCHRP 350. Similar anchor struts have also been observed in use with previous proprietary end terminal designs.
While these struts may have worked in previous designs, their performance with the MGS system is unknown. Early in the development of the MGS, the foundation tubes were extended and the overall anchorage capacity was increased to accommodate higher anchor loads for MASH testing as well as the increased angle of the cable anchor used for the 31" height of the barrier. As such, the anchor capacity of the MGS end anchorage has increased over previous trailing end anchors. Thus, I cannot guarantee that the attached strut detail has sufficient structural capacity to work in the MGS downstream anchorage.
Additionally, I am not aware of any current terminal designs using that specific strut that have conducted a beginning of LON test to verify the strut capacity with a test end anchorage. Thus, we cannot recommend substitution of the tubular strut in place of the current tested strut.
Date
March 20, 2017