Skip to main content
University
of
Nebraska–Lincoln
Log In
Search
Search
Submit
Close
Midwest Roadside Safety Facility
Menu
Search
Log In
Home
Who We Are
History
Faculty/Staff
Employment
Contact Us
Services
Testing
Finite Element Analysis
Design/Consulting
Pooled Fund
About
Member States
Active Projects
Members Only
Tech Transfer
Newsletters and Featured Research
Research Hub
AFB20 (user/password required)
Pooled Fund Q&A
Q&A Home
Ask a Question
Search Questions
Q&A Reports
Login
Q&A Home
Ask Us A Question
Search Answered Questions
Q&A Reports
Login
Nebraska
MwRSF
Q&A Home
Seach Q&A
View Q&A
View Q&A
cable barrier line post footing design
Question
State
WI
Description Text
At our pooled fund meeting, MwRSF indicated that they have done some work on line post anchors designs. The design that you have come up still have some cracking issues but it is an improvement to what we have seen. I was wondering if I could get a CADD design of the drawing. I was wondering how I could write specifications to get manufacturers to design similar line posts.
System Performance Evaluation
System Types
Applications
System Features
Date
May 2, 2013
Previous Views (121) Favorites (0)
Response
Response
(active)
During our evaluation of the socketed foundations for cable posts, we aimed to simulate a worst-case impact to the post/foundation while preventing both damage and displacement. Testing was conducted with a bogie vehicle equipped with a rigid impact head centered 12" above ground line impacting the post at a target speed of 20 mph. Note, weight of the bogie was around 1,800 lb, but lighter surrogate vehicles would be applicable as long as they have enough energy to bend and ultimately override the post. This impact was created to replicate small car bumper or bottom frame impacts.
The foundations were evaluated for both damage and displacement. Displacements less than 1" were considered acceptable, although less than 1/2" were desired. Foundations with more that 1" of displacement were considered to shallow and/or narrow to prevent excessive movements that would require the foundation to be reset during barrier repair. Similarly, damage was to be held to a minimum so as to not require repairs. It was determined that cracking and small scale concrete spalling or chipping would be allowable. Large concrete fractures would be deemed a structural failure.
The foundations have not been finalized at this time. Once they are finalized, I can get you the CAD drawings.
Date
May 13, 2013