During January and February 2008, MwRSF personnel have been assisting Wisconsin DOT staff with the design of concrete median barriers for use along the I-94 system. The analysis and design of F-shape concrete median barriers were detailed for both level terrain as well as for stepped medians, both using a reinforced concrete footing. In addition, a transition was detailed for attaching and shielding two median bridge rail ends at different grades. Draft design details have been prepared by WsDOT staff and will be included herein upon final review.
Some parts of this site work best with JavaScript enabled.