Do you have a good solution for a new Bridge w/ 2" overlay the following year A: Could we build the bridge approach section at 34” the first year?orB: Could we place a steel plate with a 2” offset below the bolts into the bridge where the 5 bolt pattern is.then remove the following year when the overlay is placed
On new construction, it would seem reasonable that one could install a concrete buttress with two different anchor patterns for the five end shoe bolts or studs, which allow for a 2” height adjustment. Some consideration could be given toward mitigating vehicle engine hood/quarter panel snag on the end of the new buttress after the approach thrie beam is lowered by 2” after one year of service. As such, there could be a downward slope or taper to reduce snag on the concrete corner. I like this option more than option A.
There also could be an option where a steel plate is used to make the switch, similar to the options discussed last winter.